3.2.1 Space and airflow requirements
3.2.2 Temperature requirements
3.2.3 Power requirements
3.2.4 Electrical grounding requirements
3.3 Rack warnings and cautions
3.4 Server warnings and cautions
3.5 Electrostatic discharge
4 Hardware options installation
4.1 Hardware option installation guidelines
4.2 Tower-to-rack conversion kit
4.2.1 Installing the tower-to-rack conversion kit
4.2.1.1 Install the rack rails and server tray
4.2.1.2 Install the server into the rack
4.3 Drive options
4.3.1 Drive installation guidelines
4.3.2 Installing a non-hot-plug LFF SATA drive
4.3.3 Installing a hot-plug LFF/SFF SAS or SATA drive
4.4 Power supply options
4.4.1 Hot-plug power supply calculations
4.4.2 Power supply warnings and cautions
4.4.3 Installing a Flexible Slot power supply
4.5 Redundant power supply enablement option
4.5.1 Installing the RPS enablement option
4.6 Media device options
4.6.1 SAS LTO tape drive option
4.6.1.1 Installing a SAS LTO tape drive
4.6.2 USB RDX backup system option
4.6.2.1 Installing a USB RDX docking station
4.6.3 Optical drive option
4.6.3.1 Installing an optical drive
4.7 PCI fan and air baffle options
4.7.1 Installing the PCI fan and air baffle
4.8 Storage controller options
4.8.1 Preparing the server for storage controller installation
4.8.2 Installing a type-p PCIe plug-in controller option
4.8.3 Storage controller guides
4.9 Energy pack options
4.9.1 HPE Smart Storage Battery
4.9.2 HPE Smart Storage Hybrid Capacitor
4.9.2.1 Minimum firmware versions
4.9.3 Installing an energy pack
4.10 Expansion card options
4.10.1 Installing an expansion card
4.11 Memory option
4.11.1 DIMM population information