EasyManua.ls Logo

Huawei E9000 - Installing PGND and Power Cables

Huawei E9000
188 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Indicator Status Meaning Diagnosis Procedure
O The network port is
not connected.
1. Connect the port
to another switch,
optical ber, and
optical module to
check whether the
original switch
and optical
ber
are normal and
whether the type
and speed of the
original optical
module are
correct.
2. Check whether
the ports on the
switch and NIC
are up.
3. Check whether
the NIC is
operating
properly.
2 x 100GE optical
port rate
indicators
Steady
green
The data
transmission rate is
100 Gbit/s.
N/A
O The network port is
not connected.
1. Connect the port
to another switch,
optical ber, and
optical module to
check whether the
original switch
and optical
ber
are normal and
whether the type
and speed of the
original optical
module are
correct.
2. Check whether
the ports on the
switch and NIC
are up.
3. Check whether
the NIC is
operating
properly.
Huawei Servers
Troubleshooting 5 Diagnosing and Rectifying Faults
Issue 20 (2020-09-25) Copyright © Huawei Technologies Co., Ltd. 76

Table of Contents

Other manuals for Huawei E9000

Related product manuals