EasyManua.ls Logo

Huawei E9000 - Powering On and Off; Powering On the E9000; Powering Off the E9000

Huawei E9000
188 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Fault
Symptom
Handling Procedure Quick Recovery Method
The POST
stops
respondin
g at a
screen.
1. Capture the current screen.
2. Collect iMana 200 or iBMC
logs, and query the CPLD
register to determine whether
the power supply link to the
mainboard has failed.
3. Set the printing level for
debugging the BIOS with the
iMana 200 or iBMC CLI.
NOTE
You can run the ipmcset -t
maintenance -d biosprint -v 1
command to print all BIOS logs.
For details, see "Querying and
Setting BIOS Print Enablement
Status (biosprint)" in the iBMC
User Guide of the required
version.
4. Enable the video recording
function on the iMana 200 or
iBMC WebUI, restart the
server, and save system serial
port logs. When the fault is
repeated, collect iMana 200 or
iBMC logs and download
the .bin
le of the BIOS.
5. Check the external USB
devices, CPUs, drives, DIMMs,
and PCIe devices.
Huawei Servers
Troubleshooting 5 Diagnosing and Rectifying Faults
Issue 20 (2020-09-25) Copyright © Huawei Technologies Co., Ltd. 90

Table of Contents

Other manuals for Huawei E9000

Related product manuals