3.2 Reference Documentation
Table 3-2 Required documentation
Item Document Name
Integrated UPS
UPS5000-E-(50 kVA–125 kVA) User Manual (Integrated
UPS 3.0)
SmartLi
SmartLi-80Ah User Manual
NetCol5000-A025
In-row Air Cooled
Smart Cooling
Product
NetCol5000-A025 In-row Air Cooled Smart Cooling
Product User Manual (300 mm Width)
ECC800-Pro
ECC800 Data Center Controller V100R021C00 User
Manual (for ECC800-Pro)
NetEco
iManager NetEco Product Documentation-
(V600R021C00)
The ECC800-Pro/NetEco version depends on the version in use. Click on the ECC800/
NetEco WebUI to obtain the current version.
3.3 Commissioning Personnel Skill Requirements
Table 3-3 Skill requirements for the FusionDC1000 commissioning personnel
Field
Personnel Skill Requirement
Power supply
and distribution
system
Familiar with the power supply and distribution system
congurations and the operations for each core device in the
FusionDC1000
With power distribution engineer qualications
Cooling system Familiar with the cooling system congurations and the
operations for each core device in the FusionDC1000
With cooling engineer qualications
FusionDC1000A Prefabricated All-in-One Data
Center
Commissioning Guide (IT Scenario) 3 Preparations for Power-On Commissioning
Issue 02 (2022-12-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 28