Figure 4-2 Clear Faults
Step 3 View active alarms and ensure that the Battery cabinet shutdown alarm has
disappeared from the alarm list.
----End
4.3 Commissioning Smart Cooling Products
Prerequisites
The power-on commissioning for the upstream PDF of air cooled precision smart
cooling products is completed.
NO TICE
Smart cooling products that use power crossfeed can be powered on only after
both power inputs are connected.
Teamwork settings can be performed only after all smart cooling products in a
group have been powered on.
Preparations
Tools: none
Documents: power supply and distribution drawings and parameters, NetCol5000-
A(025, 035) in-row air cooled smart cooling product user manual (300 mm width)
Skill requirement: cooling engineer
Procedure
Step 1 Switch on the input power circuit breakers for the air cooled precision smart
cooling product indoor units in the upstream PDF, and switch on fan circuit
FusionDC1000A Prefabricated All-in-One Data
Center
Commissioning Guide (IT Scenario) 4 Commissioning Core Devices
Issue 02 (2022-12-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 43