Prerequisites
The sockets of the emergency light have been powered on.
Preparations
Tools: step ladder, Phillips screwdriver
Documents: power supply and distribution system diagram,
re extinguishing
device layout diagram (standard)
Skill requirement: re engineer
NO TE
For the diagrams, see the initial conguration parameter manual for the solution in use.
Procedure
Step 1 Press the emergency light test button and check whether the emergency light
enters the working mode.
Figure 4-4 Emergency light button
(1) Emergency light button
----End
4.6 Commissioning Fire Extinguishing Devices (CE)
FusionDC1000A Prefabricated All-in-One Data
Center
Commissioning Guide (IT Scenario) 4 Commissioning Core Devices
Issue 02 (2022-12-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 47