Figure 5-8 Connecting cables to the electromagnetic valve
Step 18 Remove the safety pin after verifying that the re extinguishing system is working
properly.
Verify that the safety pin is removed after the re extinguishing system is
commissioned, accepted by the customer, and working properly; otherwise, the
electromagnetic valve may fail to start, and extinguishant may fail to be released
in the case of
re.
1. Remove the safety pin.
Figure 5-9 Removing the safety pin
----End
5.3 Fire Extinguishing System Commissioning (CE)
Prerequisites
● The extinguishant control panel has been powered on.
● The management system is working properly.
FusionDC1000A Prefabricated All-in-One Data
Center
Commissioning Guide (IT Scenario) 5 System Commissioning