Check Before Power-On
Table 3-4 Items to be checked before power-on
Syst
em
Check
Item
Operation Method Expected Result
Inte
grat
ed
cabli
ng
Cable
connectio
n
Check cable connections.
Check the cable layout.
Check the cable labels.
Check the fastening status.
Cables are neat, tidy not
coiled, and excessive
parts are cut.
Power cables are at
least 20 mm away from
signal cables.
Power cables are bound
at intervals of at most
200 mm. For thicker
cables, the intervals can
be greater.
Cable ties do not
overlap, and the joints
are evenly cut without
burrs.
Cables are placed
properly and not tense
at turning points.
Cable routes are straight
and smooth, and do not
intersect inside a
cabinet.
All PE cables, AC input
cables, and intra-cabinet
cables are connected
correctly according to
the power system circuit
diagram, and all screws
are fastened. The input
and output cables are
not short-circuited.
Pow
er
supp
ly
and
distr
ibuti
on
syst
em
ATS status Verify ATS settings and
remove the ATS handle.
The ATS handle has
been removed.
The motor operation
mechanism is set to .
Power
cable
insulation
Measure the insulation of the
power cables using an
insulation megohmmeter.
There is no electricity
leakage in the power
supply and distribution
system.
FusionDC1000A Prefabricated All-in-One Data
Center
Commissioning Guide (IT Scenario) 3 Preparations for Power-On Commissioning