Syst
em
Check
Item
Operation Method Expected Result
Liquid
level
detector
fastener
Check the liquid level detector
fastener.
The liquid level detector
fastener has been removed.
Smart
cooling
product
teamwork
and signal
cables
Check the connection of
smart cooling product
teamwork and signal cables.
Cables are securely
connected and meet the
design requirements.
Smart
cooling
product
pipe
connectio
n
Check the pipe connections
for the air-cooled precision
smart cooling products.
The refrigerant circulation
pipeline, humidier water
rell pipeline, and
condensate drainpipe are
properly installed, and the
thermal insulation layers
are intact.
Man
age
men
t
syst
em
Componen
t
installatio
n and
connectio
n
Check the monitoring device
installation and connection.
● Devices are installed
securely as shown in the
monitoring device layout
diagram.
● Cables are correctly
connected.
Fire
exti
ngui
shin
g
syst
em
(CE)
Device
installatio
n and
cable
connectio
ns
Check the re extinguishing
device installation and cable
connections.
● The pressure pointer of
the re extinguisher
cylinder is in the green
zone.
● The dowel of the re
extinguisher cylinder is
properly installed and
intact.
● All cables are correctly
and securely connected.
Ligh
ting
syst
em
Componen
t
installatio
n and
connectio
n
Check the lighting device
installation and connection.
● Devices are installed in
positions shown in the
lighting device layout
diagram.
● Cables are correctly
connected.
FusionDC1000A Prefabricated All-in-One Data
Center
Commissioning Guide (IT Scenario) 3 Preparations for Power-On Commissioning