Figure 8-8 Removing a ller panel
4. Close the ejector lever.
5. Place the ller module in an accessory recycle bin.
Step 3 Install the server node.
To prevent device damage or personal injury, hold the bottom of the device with
both hands when installing it.
1. Press the ejector release button on the server node. See (1) in Figure 8-9.
2. Fully open the ejector lever. See (2) in Figure 8-9.
FusionServer Pro XH321 V5 Server Node
Maintenance and Service Guide 8 Parts Replacement
Issue 17 (2021-03-09) Copyright © Huawei Technologies Co., Ltd. 48