Figure 8-9 Opening the ejector lever
3. Slide the server node into the chassis horizontally. See (1) in Figure 8-10.
4. Close the ejector lever. See (2) in Figure 8-10.
Figure 8-10 Installing a server node
Step 4 Connect the multi-port cable as required.
FusionServer Pro XH321 V5 Server Node
Maintenance and Service Guide 8 Parts Replacement
Issue 17 (2021-03-09) Copyright © Huawei Technologies Co., Ltd. 49