Category Tools and Materials
Protective shoes Firestop putty -
 
● This table may not list some tools required at specic sites. Site installation personnel
and technical support personnel should prepare tools based on site requirements.
● Prepare restop putty for sealing cable holes after cable connection. Huawei does not
provide the restop putty. The customer needs to purchase it.
5.2.3 Checking Personnel Requirements
Construction personnel must have basic knowledge of safe operation, be trained
to master correct operation methods, and have the appropriate job 
qualications.
The owner should pay attention to the following items when organizing the
construction personnel to carry out construction work:
● Construction personnel have been trained and 
qualied by Huawei to master
methods for system installation and commissioning, and have obtained work
permits before they begin to install and commission equipment.
● The number of construction personnel depends on the project progress and
the installation environment.
● Construction personnel have read through the safety precautions and related
product documents before they begin work.
5.3 Installing the PDC
Prerequisites
● The installation environment has been checked with expected results.
● The site has been closed 
o, and notices have been posted.
● The PDC has been unpacked and inspected, and no problems were found.
● You have obtained the tools and meters required for the installation.
● Installation personnel must be 
qualied and certied. Power distribution
equipment operators must hold a primary electrician 
certicate or higher.
Context
● A modular precision PDC can be installed on a concrete oor or an ESD oor.
● A modular precision PDC can be deployed separately or combined with
another cabinet.