Step 6 Install the new MCB using the MCB extracting kit, and close the handles on both
sides of the hot-swap base.
Figure 8-15 Installing an MCB
Step 7 Reinstall the front panel.
----End
8.4.5 Replacing a Fuse
Prerequisites
When replacing a fuse, you must wear insulated gloves, and must not touch the
input copper bar.
● Tools: insulated gloves, key to the PDC door
● Material: new fuse which is intact and has the same model
Context
Fuses are located in the rear of the PDC, which uses dual-input as an example.
Figure 8-16 Fuse location
PDU8000 Modular Precision PDC V2.0
User Manual 8 Maintenance Guide
Issue 04 (2021-04-13) Copyright © Huawei Technologies Co., Ltd. 129