6 Commissioning Guide
6.1 Check Before Power-on Commissioning
Table 6-1 Hardware installation checklist
No. Check Item Result
1 The cabinet is clean, without redundant screws,
copper wires, or other debris.
□Yes □No
2 The paint on the cabinet exterior is intact. □Yes □No
3 The cabinet door and lock work properly. □Yes □No
4 All labels are correct, clear, and complete. □Yes □No
5 The surrounding area of the cabinet contains no
waste tape, cable ties, paper, or packing materials.
□Yes □No
 
Table 6-2 Electrical connection checklist
No.
Check Item Result
1 All cables are connected properly. □Yes □No
2 The ground cable is connected properly. □Yes □No
3 The excessive sections of ground cables and power
cables are cut o.
□Yes □No
4 Phase cables are connected properly. □Yes □No
5 All circuit breakers are OFF. □Yes □No
 
PDU8000 Modular Precision PDC V2.0
User Manual 6 Commissioning Guide
Issue 04 (2021-04-13) Copyright © Huawei Technologies Co., Ltd. 68