Figure 5-48 Connecting the re linkage cables (scenario 2)
Step 8 Reinstall the transparent covers of the input copper bar and N bar.
Step 9 Seal the gap between cables and the cabinet using ake sealing putty. (Remove
the paper protective lm from the sealing putty and use the aluminum foil lm
together with the sealing putty.)
Figure 5-49 Fill the holes with ake sealing putty
----End
PDU8000 Modular Precision PDC V2.0
User Manual 5 Installation Guide
Issue 04 (2021-04-13) Copyright © Huawei Technologies Co., Ltd. 67