Figure 5-37 Connecting the re linkage cables (scenario 1)
Figure 5-38 Connecting the re linkage cables (scenario 2)
Step 9 Cut cable inlet and outlet holes in the rodent-proof meshes based on the number
and size of cables to be routed.
Figure 5-39 Cutting holes in the rodent-proof meshes
Step 10 Reinstall the rodent-proof meshes.
Step 11 Reinstall the transparent covers of the input copper bar and N bar.
Step 12 Seal the gap between cables and the cabinet using ake sealing putty. (Remove
the paper protective
lm from the sealing putty and use the aluminum foil lm
together with the sealing putty.)
PDU8000 Modular Precision PDC V2.0
User Manual 5 Installation Guide
Issue 04 (2021-04-13) Copyright © Huawei Technologies Co., Ltd. 60