Procedure
1. Log in to the local commissioning screen.
2. Set the energy measurement mode based on the site requirements.
– In the Smart Dongle networking scenario, choose Maintenance >
Subdevice management > PowerMeter and set Energy Measurement
Mode.
– In the EMMA networking scenario, choose Settings > Set Installation
Parameters and set Energy Measurement Mode.
SUN2000-(5K-12K)-MAP0 Series
User Manual 7 Power-On and Commissioning
Issue 01 (2024-05-13) Copyright © Huawei Digital Power Technologies Co., Ltd. 98