6 Check Before Power-On
Table 6-1 Checklist
No. Check Item Expected Result
1 Inverter The inverter is installed correctly and
securely.
2 Smart Dongle The Smart Dongle is installed correctly
and securely.
3 Cable routing Cables are routed properly as required
by the customer.
4 Cable ties Cable ties are evenly distributed and no
burr exists.
5 Grounding The PE cable is connected correctly,
securely, and reliably.
6 Switches All DC SWITCH and other switches
connected to the inverter are turned
o.
7 Cable connections The AC output power cable, DC input
power cables, and signal cables are
connected correctly and securely.
8 Unused terminals and ports Unused terminals and ports are locked
by waterproof glands.
9 Installation environment The installation space is proper, and
the installation environment is clean
and tidy.
SUN2000-(5K-12K)-MAP0 Series
User Manual 6 Check Before Power-On
Issue 01 (2024-05-13) Copyright © Huawei Digital Power Technologies Co., Ltd. 85