Type Tool
Safety goggles
- - -
4.4 Checking Before the Installation
Checking Outer Packing
Before unpacking the inverter, check the outer packing for damage, such as holes
and cracks, and check the inverter model. If any damage is found or the inverter
model is not what you requested, do not unpack the device and contact your
dealer as soon as possible.
You are advised to remove the packing materials within 24 hours before installing the
inverter.
Checking Deliverables
After placing the equipment in the installation position, unpack it with care to
prevent scratches. Keep the equipment stable during unpacking.
After unpacking the inverter, check that the deliverables are intact and complete.
If any item is missing or damaged, contact your dealer.
For details about the quantity of deliverables, see the
packing list
in the packing case.
4.5 Moving the Inverter
Procedure
Step 1 To move the inverter, two individuals are required, with one positioned on each
side. Carefully lift the inverter out of its packaging case and move it to the
designated installation area.
SUN2000-(5K-12K)-MAP0 Series
User Manual 4 Installation
Issue 01 (2024-05-13) Copyright © Huawei Digital Power Technologies Co., Ltd. 33