EasyManua.ls Logo

Huawei SUN2000 MAP0 Series - System Power-Off

Huawei SUN2000 MAP0 Series
162 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Check Item Check Method Maintenance
Interval
Cleanness of
air intake and
exhaust vents
Check periodically whether there is
dust or foreign objects at the air intake
and exhaust vents.
Power o the
inverter and remove
dust and foreign
objects. If necessary,
remove the bae
plates from the air
intake and exhaust
vents for cleaning.
Once every 6 to 12
months (or once
every 3 to 6 months
based on the actual
dust conditions in
the environment)
System
running status
Check whether the inverter is
damaged or deformed.
Check whether the inverter
generates abnormal sound during
operation.
Check whether all inverter
parameters are correctly set during
operation.
Once every 6
months
Electrical
connection
Check whether cables are
disconnected or loose.
Check whether cables are damaged,
especially whether the cable sheath
that contacts a metal surface is
damaged.
6 months after the
rst commissioning
and once every 6 to
12 months after that
Grounding
reliability
Check whether the PE cable is securely
connected.
6 months after the
rst commissioning
and once every 6 to
12 months after that
Sealing Check whether all terminals and ports
are properly sealed.
Once a year
8.2 System Power-O
SUN2000-(5K-12K)-MAP0 Series
User Manual 8 System Maintenance
Issue 01 (2024-05-13) Copyright © Huawei Digital Power Technologies Co., Ltd. 112

Table of Contents

Related product manuals