EasyManua.ls Logo

Huawei USG6000 - Appendix B: Establishing the Upgrade Environment through the Console Port; Setting up an Environment for Upgrading System Software Using Telnet;Ssh

Huawei USG6000
196 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
|
| Press Ctrl+Z to Enter Diagnose Menu... |
============================================================
Enter your choice(0-6):
2
Current boot application software: <hda1:/
V500R001C**.bin>
Current boot configuration: <hda1:/
vrpcfg_new.cfg>
<1> Modify
setting
<0>
Quit
Enter your choice (0-1):
1
After the setting is complete, enter 0 to return to the BootROM main menu.
Step 8 In the BootROM main menu, enter 0 to restart the device.
----End
1.6 Appendix B : Establishing the Upgrade Environment
Through the Console Port
1.6.1 Setting Up an Environment for Upgrading System Software
Using Telnet/SSH
Prerequisites
The prerequisites for console port login are as follows:
l A PC (with RS232 serial port) and an RS-232 cable are available.
l A terminal simulation program (such as Windows XP HyerTerminal) is installed on the
PC.
l The USG6000 is powered on and running properly.
Context
IP address 192.168.0.1 has been set for interface GigabitEthernet 0/0/0 on the USG6000 by
default. You can use this IP address and the default user name admin and password
Admin@123 to log in to the CLI of the USG6000 through Telnet. If the Telnet configuration
HUAWEI USG6000&USG9500
Upgrade Guide
1 USG6000
Issue 01 (2018-01-16) Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
88

Table of Contents

Related product manuals