Procedure
Power on the USG.
The USG starts after the switch of the power supply device is turned on.
You can identify the USG status based on indicators on the front panel.
Indicators shown in Figure 5-19 indicate that the USG is running normally.
Figure 5-19 Indicators when the USG runs normally
Power
o the USG.
NO TICE
Before powering o the USG, ensure that conguration data is saved.
Otherwise, the conguration data may be lost.
If the USG will be administratively shut down for a long time, turn o the
power switch. After powering o the USG, set it aside properly according to
storage requirements.
----End
Follow-up Procedure
After the USG is powered on, you can log in to the
conguration page for
management and maintenance. For details, refer to the
Conguration Guide.
5.4 Installing a 420 mm Deep Device
This chapter provides the cabinet-mounting, workbench-mounting, and cable
connection methods of the USG6515E, USG6525E, USG6550E, USG6555E,
USG6560E, USG6565E, USG6575E-B, USG6580E, USG6585E, USG6605E-B,
USG6610E, USG6615E, USG6620E, USG6625E, USG6630E, USG6635E, USG6650E,
USG6655E series.
HUAWEI USG6000E Series
Hardware Guide 5 Hardware Installation
Issue 08 (2022-04-20) Copyright © Huawei Technologies Co., Ltd. 533