● Power o the USG.
Before powering o the USG, ensure that conguration data is saved.
Otherwise, the conguration data may be lost.
If the USG will be administratively shut down for a long time, turn o the
power switch. After powering
o the USG, set it aside properly according to
storage requirements.
If the USG has hard disks, do not power o the USG by removing the power
cable or switching
o the power supply to prevent data loss and hard disk
damage. You must run the disk oine command in the system view rst and
wait for about 30 seconds. After the system prompts you with a message
indicating that hard disks have stopped, turn
o the power switch of the USG.
----End
Follow-up Procedure
After the USG is powered on, you can log in to the conguration page for
management and maintenance. For details, refer to the
Conguration Guide.
5.5 Installing a 600 mm Deep Device
This chapter provides the cabinet-mounting, workbench-mounting, and cable
connection methods of the USG6680E, USG6712E, USG6716E series.
5.5.1 Mounting a Device in a Cabinet
Install the USG6680E, USG6712E, USG6716E to the 19-inch standard cabinet
through the expandable rear mounting ears.
Precautions
Before installing the USG, check the following items:
● Before unpacking the carton, ensure that the packing carton is intact and not
damaged or soaked. Stop unpacking if the USG is rusted or soggy. Then,
investigate causes and contact the supplier.
● The cabinet is stable.
● Before installing the expandable rear mounting ears on the USG6680E,
USG6712E, USG6716E, adjust the distance between the front and rear angle
gauges (rack mounting rails/vertical columns) to satisfy the installation
requirements. The
specic scope of application is as follows:
HUAWEI USG6000E Series
Hardware Guide 5 Hardware Installation
Issue 08 (2022-04-20) Copyright © Huawei Technologies Co., Ltd. 561