Table 5-1 Installation environment checklist
Check Item Requirement Compliance
Ventilation and heat
dissipation
Complies with
requirements in Device
Position.
□ Y □ N □ N/A
Stability □ Y □ N □ N/A
Grounding □ Y □ N □ N/A
Temperature Complies with
requirements in
Humidity, Temperature,
and Cleanness.
□ Y □ N □ N/A
Relative humidity □ Y □ N □ N/A
Cleanness □ Y □ N □ N/A
Electrostatic discharging Complies with
requirements in ESD
Requirements.
□ Y □ N □ N/A
Surge protection Complies with
requirements in
Lightning Protection
and Grounding.
□ Y □ N □ N/A
Power supply facility Complies with
requirements in Power
Supply.
□ Y □ N □ N/A
Electromagnetic
shielding
Complies with
requirements in
Electromagnetic
Protection.
□ Y □ N □ N/A
5.2.3 Instruments Required for the Installation
This section describes the instruments and meters for installing the USG.
Table 5-2 lists the required instruments and meters for USG installation.
Table 5-2 Required instruments and meters
Category
Instrument/Meter
Measuring and
lineation
instruments
● Ruler: used to measure length.
● Marker: used to indicate specic lengths with drawn
lines.
Fastening tools ● Flat-head screwdriver: used to fasten small screws and
bolts.
● Phillips screwdriver: used to fasten small screws and
bolts.