EasyManua.ls Logo

Hypertherm XPR170 - Installation; Before You Begin

Hypertherm XPR170
428 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
XPR170 Instruction Manual 810060 73
Installation
Before you begin
Before you begin installation, make sure to:
Read, understand, and follow all of the safety instructions that are in this manual, the Safety
and Compliance Manual (80669C), the Radio Frequency Warning Manual (80945C), and
affixed to the cutting system. Failure to follow safety instructions can result in personal injury
or equipment damage.
Get all necessary reference documents. Refer to Document requirements on page 39.
Consider the following requirements about where to position system components:
Site requirements on page 61
Length requirements for hoses, cables, and leads on page 61
Bend radius requirements for hoses, cables, and leads on page 62
Distance requirements between high-frequency leads and control cables on page 63
Distance requirements for ventilation and access on page 63
Distance requirements for communications on page 64
Review the Installation checklist on page 74.
This plasma system can make more than the permitted acoustical noise levels as defined by national
and local codes. Always put on correct ear protection when cutting or gouging. Any acoustical
noise measurements taken are related to the specific environment in which the system is used.
Refer to Noise can damage hearing in the Safety and Compliance Manual (80669C).
In addition, you can find an Acoustical Noise Data Sheet for your system at
www.hypertherm.com/docs. In the search box, enter data sheet.

Table of Contents

Other manuals for Hypertherm XPR170

Related product manuals