8.2 Inspection items and schedule
8-3
8. Maintenance and Inspection
8.2 Inspection items and schedule
Follow the maintenance inspection schedule below.
It is assumed that the equipment is operating 8 hours per day.
If the equipment is running continuously night and day or otherwise running at a high operating
rate, inspect more often.
Slider type
High rigidity slider type (EC-S□□AH),
High rigidity slider type (EC-S□□H)
Inspection period
External
inspection
Internal
inspection
Greasing
Ball screw Guide
Start of work inspection
1-month inspection
3-month inspection
3-month inspection on
Grease supply timing (Guideline)
dependent
6-month inspection
Every 6 months thereafter
Rod type
Inspection period
External
inspection
Greasing
Rod sliding
surface
Frame interior
Start of work inspection
1-month inspection
3-month inspection
3-month inspection on
Every 3 months
Grease supply timing (Guideline)
dependent
6-month inspection
Every 6 months thereafter
*Stainless steel sheet life guideline: 5,000km