EasyManua.ls Logo

IAI EC-S7 - Radial Cylinder Type; High Rigidity Radial Cylinder Type (EC-RRAH), High Rigidity Radial Cylinder Type (EC-RRH); Grease Supply Timing; High Rigidity Radial Cylinder Type (EC-RRAH)

Default Icon
348 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
8.2 Inspection items and schedule
8-4
8. Maintenance and Inspection
Radial cylinder type
High rigidity radial cylinder type (EC-RR□□AH),
High rigidity radial cylinder type (EC-RR□□H)
Inspection period
External
inspection
Internal
inspection
Greasing
Ball screw Guide
Rod
sliding
surface
Start of work inspection
1-month inspection
3-month inspection
3-month inspection on
Depends on greasing
timing (guideline)
Every
3 months
6-month inspection
Every 6 months thereafter
Grease supply timing
Maximum operating speed [mm/s]
Grease supply timing (Guideline)
Operation distance Months
0 to 750 or less 1,250km
12 months
Over 750 to 860 2,500km
(Guideline)

Table of Contents

Related product manuals