EasyManua.ls Logo

IBM Selectric

IBM Selectric
153 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
FIGURE
15.
Lower Ball
Socket
and
Tilt
Ring Removal
2
FIGURE
16.
Lower Ball
Socket
and
Tilt
Ring Removal
ROTATE
TAPE
REPLACEMENT
1.
Remove
the
I
eft
and
ri
ght
dust
covers.
2.
Position
the
carrier
3"
from
the
left
frame.
3.
Remove
the
broken
pieces
of
tape
from
the
machine.
4.
Disconnect
the
tilt-pulley
tension
spring
(#3,
Figure'l7).
5.
Pull
the
tilt
ring
toward
the
front
of
the
machine
and
turn
the
rotate
pulley
until
the
T
-slot
is
accessible
(#1,
Fig-
ure
17).
6.
Insert
the
rotate
tape,
eyelet
first
(#2,
Figure
17),
be-
3-5
FIGURE
17.
Rotate
Tape
Replacement
FIGURE
18.
Rotate
Tape
Replacement
tween
the
rotate
pulley
and
the
right
side
of
the
yoke
from
beneath
the
ribbon
mechanism.
7.
Pull
the
tape
through
and
insert
the
T
-tip
of
the
tape
into
the
T-slot
ofthe
pulley
(#1,
Figure
18).
8.
Thread
the
tape
around
the
rotate-arm
pulley,
top
to
front,
keeping
it
under
the
carrier-return
cord,
around
the
shift-arm
pulley,
and
anchor
it
to
the
carrier.
9.
Connect
the
ti
It-pulley
spring.
(Gear
type
with
open
end
to
the
rear.)
10.
Restore
the
2 pounds
of
rotate-spring
tension.
11.
Check
the
typehead
homing
adjustment.

Table of Contents

Other manuals for IBM Selectric

Related product manuals