Task Frequency Description
Test warning
device outputs
As agreed between
monitoring company
and client, but not
less than once per
year
May be performed
alongside Input
Testing (above)
Note: This procedure must be pre-arranged in consultation with the
monitoring station.
Test the operation of each audible and visible warning device.
Consult the maintenance sheets for a list of all outputs to be tested.
Arm any relevant areas.
Activate each warning device, either by user operation or by
triggering an alarm which should cause activation.
Check that each warning device works as specified. Record and
report any discrepancies.
Reset/Restore alarm areas to their previous state.
Software Maintenance Procedures
Task Frequency Description
Back up
programming
database
Recommended
monthly
Backups of the programming database should be performed on a regular
basis. It is vital that backups be stored offsite for disaster recovery.
See the Operator Reference Manual for instructions on how to backup
your database.
Back up events
database
Recommended
monthly
Backups or exports of recorded events should be performed on a regular
basis. Verify that the backup file has been created.
See the Operator Reference Manual for instructions on how to backup
your database.
Follow-up Procedures
Task Frequency Description
Perform necessary
system
modifications
As required
Complete any modifications to the system resulting from the
maintenance procedures. Record these in the maintenance sheets
and report.
Obtain client sign
off
At the conclusion of
each maintenance
visit
Obtain the signature of the client or the client's representative on
the maintenance record.
PRT-CTRL-DIN | Protege GX DIN Rail Integrated System Controller | Installation Manual 49