11
6
11
11
7
8
9
9
9
1
1
1
10
10
10
20
23
Manifold kit composition Ø 160 Victrix Pro V2 additional boiler 35-55-60-68-80 EU
Ref. Qty Description
9 1 Boiler connection DN80
10 1 Clapet DN80
11 1 Boiler manifold DN160
4.3 ASSEMBLY OF ADDITIONAL BOILER MANIFOLD KIT FOR VICTRIX PRO V2 3555606880 EU
e extension kits make it possible to complete cascade installation, and you must have one for each boiler being connected, according to gure 20 (max of 5 boilers
in cascade).
Replace the intake closing cap on the boiler with the intake stub kit (1).
To make the connections (9) as shown in the gure according to the position of the boiler.
en engage them on the boiler until they are to the end stop, taking care to orientate the clapet valve (10) correctly.
Connect the additional boiler manifolds (11) to the relative connections (9) and tighten the ring nut of each connection
Connect the manifold with condensate drain (7) to the manifold (11).
Now connect the condensate drain trap (8) to the manifold (7).
boiler 1
boiler 2
boiler 3
boiler 4
boiler 5