EasyManuals Logo

IMT 5525 Parts & Specifications

Default Icon
122 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #57 background imageLoading...
Page #57 background image
Chapter 4 Parts 55
A
39
48
35
37
38
36
36
1
46
46
6
27
26
30
33
29
29
31
2
8
41
9
43
44
10
47
USE ANTI-SEEZ
34,36
18,19,20
19,24
28(2)
APPLY MULTI-PURPOSE GREASE
TO BEARINGS BEFORE INSTALLING
BOOMS TO MAST.
20(3)
USE ANTI-SEEZ
7(2)
18(3)
19(3)
21,22,23
(4 PLCS)
12, 13
OR 14
DETAIL A
15(2),
16(4),
17(2)
USE BLUE
THREAD
LOCKER
32(4)
DOWN
HAUL
WEIGHT
NOTES:
1 FOR DOUBLE BOOM LINE APPLICATION, INSTALL PIN #18 THROUGH BOOM SIDE PLATE AND THEN
THROUGH WIRE ROPE CLEVIS.
2 IF REQUIRED, USE 72063039 MACHINERY BUSHINGS BETWEEN MAST AND BOOM WHEN INSTALLING
PIN #7.
3 CRANE IS SHOWN AS ASSEMBLED ON ASSEMBLY STAND. NOTE LOCATION OF HYDRAULIC MOTOR.

Table of Contents

Other manuals for IMT 5525

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the IMT 5525 and is the answer not in the manual?

IMT 5525 Specifications

General IconGeneral
BrandIMT
Model5525
CategoryConstruction Equipment
LanguageEnglish

Related product manuals