2 Mechanical Installation
- 26 -
Figure 2-1 Transporting equipment before unpacking
■
Ensure that the ground at the installation location is at and strong enough to bear
the weight of the equipment.
■
Structures T9 to T12 are heavy with high centers of gravity, which cannot be placed
on a slope with an inclination of more than 5° .
■
The equipment must always be transported in the upright position indicated. The
equipment must not be transported upside down or in a horizontal position.
Figure 2-2 Placing