2 Mechanical Installation
- 26 -
Figure 2-1  Transporting equipment before unpacking
Ensure that the ground at the installation location is 󶍿at and strong enough to bear
the weight of the equipment.
Structures T9 to T12 are heavy with high centers of gravity, which cannot be placed
on a slope with an inclination of more than 5° .
The equipment must always be transported in the upright position indicated. The
equipment must not be transported upside down or in a horizontal position.