2 Mechanical Installation
- 37 -
2.5.3 Procedure for Installing the AC Drive in a Cabinet
Step Operation
1 Install the xing beam in the nine fold prole cabinet, as shown in Figure 2-13.
2 Secure the bottom mounting bracket, as shown in Figure 2-14.
3 Assemble the guide rail (option) and connect the guide rail to cabinet.
4
Remove the cover from the AC drive (see
"2.6 Cover Removal and Mounting"
) to
expose the handle.
5
Arrange two persons to align casters of the AC drive to the guide rail and push the
AC drive into the cabinet slowly, as shown in Figure 2-18 and Figure 2-19. Use soft
strap in the process of push-in and push-out to prevent turnover.
6
Remove the soft strap. There are two mounting holes at the back of the AC drive.
Secure the mounting holes at the top and bottom parts at the back of the AC drive
to secure the AC drive to the xing team, as shown in Figure 2-20.
7 Check that installation of the AC drive is secure and remove the guide rail.
■
Installing the xing beam and reserving mounting holes
1) A nine-fold prole cabinet (PS cabinet) is recommended for installation of the AC
drive. The cross section of the nine-fold prole cabinet is shown in Figure 2-13.
2) When structures T10 to T12 are mounted in the nine fold prole cabinets of 600
mm deep, the xing beams must fold inwards, as shown in Figure 2-14. When the
AC drive is mounted in the cabinet of 800 mm deep, folding inwards is not required.
"$ESJWF
'JYJOHCFBN
/JOFGPME
QSP珝MFDBCJOFU
/JOFGPMEQSP珝MF
'JYJOHCFBN
'SPOUEPPS
NN
NN
NN
NN
Figure 2-13 Top view of structures T10 to T12 in the cabinet