2 Mechanical Installation
- 38 -
/JOFGPMEQSP珝MF
"$ESJWF
'JYJOHCFBN
Figure 2-14 3D view of structures T10 to T12 in the cabinet
◆
If the cabinet has a front door and a back door, the cabinet of 600 mm
deep is too small to accommodate structures T10 to T12. In this case, the
cabinet of 800 mm deep is recommended.
■
Fixing the bottom mounting bracket
1) Use six M5 tapping screws to x the mounting bracket on the nine fold prole
cabinet according to the following gure (for the mounting bracket drawing, see
"2.5.4 Dimensions of the Mounting Bracket"
).
2) If a non-nine fold prole cabinet is used, drill mounting holes for the mounting
bracket on site.
.TFMGUBQQJOHTDSFX
2VBOUJUZ1$4
#PUUPNNPVOUJOHCSBDLFUTUBOEBSE
Figure 2-15 Installing the bottom mounting bracket
3) Assemble the guide rail (model: MD500-AZJ-A3T10, option).
As shown in the following gure align the two holes at the front of the guide rail with
the studs of the mounting bracket, and x them with two M6 nuts.