EasyManua.ls Logo

Inovance MD880 Series - Page 39

Inovance MD880 Series
152 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
2 Mechanical Installation
- 38 -
/JOFGPMEQSP珝MF
"$ESJWF
'JYJOHCFBN
Figure 2-14 3D view of structures T10 to T12 in the cabinet
NOTE
If the cabinet has a front door and a back door, the cabinet of 600 mm
deep is too small to accommodate structures T10 to T12. In this case, the
cabinet of 800 mm deep is recommended.
Fixing the bottom mounting bracket
1) Use six M5 tapping screws to 󶍾x the mounting bracket on the nine fold pro󶍾le
cabinet according to the following 󶍾gure (for the mounting bracket drawing, see
"2.5.4 Dimensions of the Mounting Bracket"
).
2) If a non-nine fold pro󶍾le cabinet is used, drill mounting holes for the mounting
bracket on site.
/JOFGPMEQSP珝MFDBCJOFU
.TFMGUBQQJOHTDSFX
2VBOUJUZ1$4
#PUUPNNPVOUJOHCSBDLFUTUBOEBSE
Figure 2-15 Installing the bottom mounting bracket
3) Assemble the guide rail (model: MD500-AZJ-A3T10, option).
As shown in the following 󶍾gure align the two holes at the front of the guide rail with
the studs of the mounting bracket, and 󶍾x them with two M6 nuts.

Table of Contents

Related product manuals