Battery Simulation Function
Copyright © Itech Electronic Co., Ltd. 62
5. On the Battery Simulation Function interface, press the right [Channel 1/2]
soft key to select configuring channel CH1. (Only IT6402/IT6412/IT6412S
contain this step.)
6. Press the [Mode] soft key to select test mode Simulator, and press the [OK]
key for confirmation.
7. Press the [Save] soft key and the display screen prompts ”Please Import
BatteryCH1.csv File”, “Importing, Please Wait....”, “Import Finished!”
and ”Please Select Group 00” in order. Select the group in which the
characteristic data is to be saved.
⚫ IT6411/IT6431/IT6432/IT6433/IT6411S/IT6432S
⚫ IT6402/IT6412/IT6412S
8. Press the Numeric key or Knob to set the group number. For example,
save the data in Group 5 and press the [OK] key for confirmation.