OPERATING AND MAINTENANCE HANDBOOK
Operations from ground
Controls enabling the operator to switch the machine on and operates
with the ground control panel are the following:
•Starting and enabling ground controls
•Platform liing/lowering
•Starting and enabling platform controls
•Emergency stop
Other functions hereinaer described are:
•Overload pilot light
•Baery charge indicator
•Hour counter
•Diagnostic display
Make sure that STOP push buon on ground or platform control
panel is not pressed.
Starting and enabling ground controls
•Each time the machine is started up, the signal lights and audible
alarms are switched on to verify their correct running (pilot lights
and buzzer). Before using the machine, wait they are switched o.
•Insert key in selector 1 and turn le, keeping this position, in or-
der to put ground controls into operation (in this position it is not
possible to extract the key); the pilot light 6 go on. If the key has
released, it returns automatically in the middle position (OFF), and
the machine are stopped. 