EasyManua.ls Logo

jcb 8026 CTS - Warming up

jcb 8026 CTS
332 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Operation
Starting the Engine
105 105
9811/9950-1
Warming Up
P11-2032
Before starting work in temperatures below -15°C (5°F),
hydraulic fluid must be warmed.
1 Warm up the engine:
After starting the engine set the throttle lever to mid
position and run for 10 minutes.
Note: Do not operate any services. After the warm up
period make sure that everyone is clear of the machine.
2 Warm up the hydraulic oil:
a Increase engine speed to maximum. Warm the
hydraulic oil by repeatedly selecting bucket crowd
by moving the right hand lever to the left for 5
seconds. Repeat for several minutes.
b Select dozer up by moving dozer control lever
backwards, keep selected for one minute.
3 Warm up hydraulic circuit:
a Reduce engine speed by moving throttle lever to
mid position.
b Raise and lower boom from ground level to full
height five times.
c Stroke the dipper fully in both directions, five
times.
d Rotate the bucket fully in both directions, five
times.
e Slew the upper structure clockwise for one
revolution and stop. Slew the upper structure
anticlockwise for one revolution and stop.
f Repeat 3c three times.
4 The machine should now operate correctly. Should
operation still appear slow, then steps 3b and 3c may
be repeated.
HE Services

Table of Contents

Other manuals for jcb 8026 CTS

Related product manuals