EasyManua.ls Logo

JDS Uniphase SmartClass E1 - Transmitting Traffic over a Datacom Interface

JDS Uniphase SmartClass E1
144 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Chapter 5 Datacom Testing
Frame Relay testing
72 SmartClass E1 Tester User’s Guide
8 Connect the E1/Datacom Tester to the circuit. For more information, see
“Connecting the E1/Datacom Tester to the circuit” on page 61.
9 On the Test menu, select Restart to begin the test.
You are monitoring frame relay traffic on a datacom interface.
Transmitting traffic over a
Datacom interface
The E1/Datacom Tester can also transmit frame relay traffic over a Datacom
interface.
To transmit frame relay traffic over a Datacom interface
1 f you haven’t already done so, launch the Frame Relay application (see
“Launching the Frame Relay application” on page 64).
2 On the Configuration menu, select Data Comm., and then specify the
settings.
3 Specify the frame load settings. See “Configuring the frame load settings”
on page 66.
4 Specify the frame header settings. See “Configuring the frame header
settings” on page 68.
5 Specify the local management interface settings. See “Configuring the LMI
Settings” on page 69.
6 Specify how link trace results should be displayed. See “Configuring the
trace settings” on page 70.
7 Configure flow control settings. See “Specifying flow control settings” on
page 70.
8 After you finish configuring the test settings, press Cancel to return to the
Test menu.
9 Connect the E1/Datacom Tester to the circuit. For more information, see
“Connecting the E1/Datacom Tester to the circuit” on page 61.
10 On the Test menu, select Restart soft key to begin the test.
The E1/Datacom Tester transmits frame relay traffic over the Datacom inter-
face.

Table of Contents

Other manuals for JDS Uniphase SmartClass E1

Related product manuals