EasyManua.ls Logo

JDS Uniphase SmartClass E1 - Testing MFC-R2 Signaling

JDS Uniphase SmartClass E1
144 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Chapter 4 E1 Testing
Testing MFC-R2 Signaling
46 SmartClass E1 Tester User’s Guide
Testing MFC-R2 Signaling
The SmartClass E1’s MFC-R2 signaling option allows testing of line signaling
(supervisory signals) and inter-register signaling (call control signals).
This test involves three basic steps:
Configuring test settings
Connecting to the circuit
Running the test
Configuring test settings
Before running any tests, you should configure the E1 Tester with the appro-
priate settings for the line under test.
To configure test settings
1 From the E1 Measurement menu, launch the E1 R2 application.
2 From the E1 R2 menu, select Configuration.
The Configuration menu appears.
3 Specify values for the Test Mode and Country, as described below:
4 Select Interface, and then specify the values as described below:
NOTE:
MFC-R2 Signaling is an optional feature. It only appears if you have pur-
chased the MFC-R2 software option.
Setting Parameter
Test Mode Select one of the following:
Simulate
–Monitor
Bridge (HI-Z)
Country Select one of the following:
–ITU-T
Mexico
Brazil
Brazil (San Paolo)
–India
Philippines
China
–User Defined
Setting Parameter
Line Code Select one of the following line coding
options:
HDB3: High Density Bipolar 3
AMI: Alternate mark inversion

Table of Contents

Other manuals for JDS Uniphase SmartClass E1

Related product manuals