EasyManua.ls Logo

joule Modul-AIR All-E - Commissioning Green Comfort unit

joule Modul-AIR All-E
116 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
86 www.jouleuk.co.uk | www.joule.ie
Commissioning Green Comfort unit
The All-E version of the Modul-AIR can be connected to a Green Comfort Module. With this module the
dwelling can also be ventilated balanced and treated fresh air supply.
The procedure to setup the Green Comfort Module as follows:
To access the installer functions of the Modul-AIR unit, navigate
to the spanner icon on the home screen.
Next, scroll to the right to the Settings tile and press the icon.
Enter the login code to access the installer functions. The
installer code is issued during the Modul-AIR Joule installer
training program.
Navigate to the selection menu.
Select the Green Comfort.

Related product manuals