Load management program
91 / 156
6.6.5 View Power Profile
Configuration menu - View Power Profile
Point in time at which the validity of a Power Profile begins. A Power Pro-
file remains valid until its successor gets valid.
Special day at which the Power Profile overrides the currently active
Power Profile.
Percentage of the Maximum Current Offered that is reserved for Electric
Vehicles using high-level communication.
Maximum current Charge
Point:
Max available current (in Ampere) that is available at the Charge Point.
Most likely, this is a limitation determined by the power delivery contract
of the organization using the M10 system.
Days at which the Power Profile is valid.
Time period from / to the Power Profile is valid.
Maximum current for this Power Profile.
Energy price during this Power Profile.
Current (in Ampere) that is reserved for charging by vehicles using high-
level communication.