EasyManua.ls Logo

Kemppi X8 - Page 52

Kemppi X8
178 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
X8 MIG WELDER 2.4 Installation
1.
Connect the interconnection cable to the wire feeder
a) Lift the cable cabinet latch to reveal the connectors.
b) Connect the welding current cable to the wire feeder. Push the cable as far as it goes and
turn the connector clockwise to tighten the cable to its place.
Caution:
Tighten the welding current cable as much as you can by hand. If the welding
current cable connection is loose, it may overheat.
c) Push the shielding gas hose towards the shielding gas hose connector base until it locks
down.
d) Attach the strain relief to the slot on the wire feeder.
e) Lock the strain relief latch to secure the strain relief.
f) Connect the control cable to the connector. Rotate the collar clockwise to lock it in place.
g) Connect the measurement cable to the connector. Rotate the collar clockwise to lock it in
place.
h) If you have the optional cooler, pull the cover over the cooling water hoses' slot to remove
it.
OPERATING MANUAL | EN 52
©
KEMPPI 2017 | 1817

Related product manuals