8. Manage the inspections
Each saved inspection is linked to a customer. It is possible to see the details of an inspection, to add one or to delete one.
Available inspections in the analyser are the following: combustion, ambient temperature, flue gas temperature, internal temperature,
Flow/Return temperature, dew-point temperature, draft pressure, differential pressure, flue gas velocity, Max CO, opacity, ambient CO
2
,
ionisation current, leak detection, gas network tightness and gas flow.
The maximum number of inspections is 10 per boilers.
8.1. Get to inspections
To find every inspections of a customer and details of this inspection, follow the specified procedure:
The list of customers saved in the analyser is displayed.
Go to the required customer then press OK.
Every boilers linked to this customer are displayed.
Go to the required boiler then press OK.
Every inspections linked to this customer and boiler are displayed.
Go to the required inspection then press OK.
Details of the inspection are displayed.
8.2. Create an inspection
It is possible to create an inspection for specific customer that will be performed later.
The list of customer's inspections is displayed.
Press the “Add” function key to add an inspection.
A list of inspections is displayed.
Go to the required inspection then press OK.
The inspection is added with “Not done” mention.
8.3. Delete an inspection
To delete an inspection of a customer.
The list of customer's inspections is displayed.
Press the “Delete” function key to delete an inspection.
Go to YES then press OK to delete the inspection or go to NO then press OK to cancel.
8.4. Create a group
Groups allow to gather measurements in a folder. This function has to be activated (see page 18). To create a group:
Once the measurement is finished, press the “Save” function key to save it.
The analyser displays the recorded customers list.
Select a customer with the keypad and press OK or create customer (see page 23) and select it.
The analyser displays the available boilers list.
Select a boiler with the keypad and press OK or create a boiler (see page 24) and select it.
The analyser confirms the recording is done.
Press OK.
The analyser proposes to add the measurement to a group.
Choose YES to create a group: press the “Add” function key.
Press OK to name the group.
The keyboard appears.
Use the direction arrows to select letters and press OK to validate them.
Press the “OK” function key to validate the name.
Press the “Save” function key to save the group.
Press OK to save the measurement in this group.
The instrument backs to the measurement screen.
The created group appears in the inspections list:
Go to the “Customer” menu with the keypad and press OK.
The analyser displays the list of recorded customers on the instrument.
Go to the required customer with the arrows and press OK.
The analyser displays all the boilers linked to this customer.
Go to the required boiler with the arrows and press OK.
The analyser displays all the inspections linked to this customer and boiler and the created groups.
Manage the inspections 25