EasyManua.ls Logo

Kioti CK2810 - OPERATION TIP for 3-POINT HITCH Elements; Adjustment of TOP Link

Kioti CK2810
180 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
5
-
5
운운 운운
MX70/MX80/MX90/MX100
5
-
4
5
-
5
운운 운운
MX70/MX80/MX90/MX100
5
-
4
5
3-POINT HITCH IMPLEMENT AND LOADER OPERATION
6
6
-
5
M56O601A
(1) Top Link
(2) Lift Rod (L)
(3) Lift Rod (R)
(4) Check Link
(5) Lower Link
(6) Draw Bar
OPERATION TIP FOR 3-POINT HITCH ELEMENTS
1. Install the top link to the desired
hole, install the set pin and lynch
pin securely.
2. Tighten the lock nut on the top link
securely after adjusting top link
length.
M56O602A
(1) Top Link
ADJUSTMENT OF TOP LINK
󳜍󲧑󳏥 󲛹󳞙

Table of Contents

Related product manuals