EasyManua.ls Logo

Leibinger JET3 up - Page 136

Leibinger JET3 up
214 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Service Manual JET3
136 Rev. 1.0
13. Close the gutter tube with the button <Close Nozzle> (1), switch the <Ink on> (2) and
activate the <Ink-Flow-Sensor> (3).
1 Button <Close Nozzle>
2 Button <Ink on>
3 Button <Ink Flow Sensor>
14. Bring the drop production unit into the print position. Then install the inner cover and
tighten it. Dont smash or brake any cables and pipes during this
action.
15. Check the jet for the right position in the gutter and the electrodes.
1
2
3
Pull the allen key carefully out of
the bearing block again.

Table of Contents

Other manuals for Leibinger JET3 up

Related product manuals