EasyManua.ls Logo

Leibinger JET3 up - Exchange Gutter Tube (SK4)

Leibinger JET3 up
214 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Service Manual JET3
Rev. 1.0 83
6) Exchange gutter tube
1. Switch on the JET3up and wait until initializing is finished.
2. Select the softkey <Hydraulic settings> (1) and switch to tab <Printhead> (2).
3. Push the button <Ink off> (1) and afterwards open the nozzle by pushing
the button <Jet Adjust> (2).
4. Open the nozzle completely with the <arrow> (1) button.
2
1
1
1
2

Table of Contents

Other manuals for Leibinger JET3 up

Related product manuals