EasyManua.ls Logo

Lenovo ThinkSystem DG5000 - Completing the Replacement Process

Lenovo ThinkSystem DG5000
122 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Step 4. Verify that the environmental variables are set as expected.
a. Take the node to the LOADER prompt.
b. Check the environment variable settings with the printenv command.
c. If an environment variable is not set as expected, modify it with the
setenvenvironment_
variable_name changed_value command.
d. Save your changes using the saveenv command.
e. Reboot the node.
Step 5. The next step depends on your system configuration:
If your system is in...
Then...
An HA pair
After the impaired node is displaying the
Waiting for Giveback... message, perform a
giveback from the healthy node:
1. Perform a giveback from the healthy node:
storage failover giveback -ofnode partner_
node_name
This initiates the process of returning
ownership of the impaired node's
aggregates and volumes from the healthy
node back to the impaired node.
Note: If the giveback is vetoed, you can
consider overriding the vetoes.
If giveback
is vetoed
2. Monitor the progress of the giveback
operation by using the storage failover
show-giveback
command.
3. After the giveback operation is complete,
confirm that the HA pair is healthy and that
takeover is possible by using the storage
failover show command.
4. Restore automatic giveback if you
disabled it by using the
storage failover
modify command.
Completing the replacement process
After you replace the part, you can return the failed part to Lenovo, as described in the RMA instructions
shipped with the kit.Contact technical support at
Lenovo Data Center Support if you need the RMA number or
additional help with the replacement procedure.
Step 1. Recable the system storage and networking cables, as needed.
Step 2. Reconnect the power supply.
a. Open the power cable retainer and plug the power cable into the power supply.
b. Plug the power cable into the power source.
Step 3. Return the node to normal operation by giving back its storage from the running node:
storage
failover giveback -ofnode impaired_node_name
Chapter 4. Hardware replacement procedures 59

Table of Contents

Related product manuals