Cable wall brackets replacement (full-heigh/half-height)
Use this information to remove and install the full-height or half-height cable wall brackets.
Your server supports two full-height or half-height cable wall brackets on the left and right side of the system
board:
• Half-height: designed for most models;
• Full-height: specially designed for models with 32 NVMe drives.
• “Remove the cable wall brackets” on page 155
• “Install the cable wall brackets” on page 158
Remove the cable wall brackets
Use this information to remove full-height or half-height cable wall brackets.
About this task
Your server is shipped two half-height or full-height cable wall brackets on the left and right side of the
system board. The illustration shows the removal of the full-height cable wall brackets, the removal method
of the half-height cable wall brackets is the same.
Attention:
• Read “Installation Guidelines” on page 129 to ensure that you work safely.
• Prevent exposure to static electricity, which might lead to system halt and loss of data, by keeping static-
sensitive components in their static-protective packages until installation, and handling these devices with
an electrostatic-discharge wrist strap or other grounding system.
A video for this task is available at:
• Youtube:
https://www.youtube.com/playlist?list=PLYV5R7hVcs-Bz2XIeLEfGcrLGm9TSY_yt
• Youku: http://list.youku.com/albumlist/show/id_52339612.html
Chapter 4. Hardware replacement procedures 155