EasyManua.ls Logo

MacDon M150 2008 - Page 89

MacDon M150 2008
222 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
HEADER OPERATION – D SERIES
Form 169017 87 Issue – June 2008
j. Disconnect center link as follows:
MECHANICAL LINK – M150
1. Loosen nut (F) and rotate barrel (G) to
relieve load on link.
2. Remove cotter pin on pin (H), and remove
pin to disconnect from tractor. Re-install pin
in header.
3. Tighten nut (F) against barrel. A slight tap
with a hammer is sufficient.
HYDRAULIC LINK – M200 STD, M150 OPTION
1. Start engine and activate header tilt cylinder
switch on GSL to release load on center link
cylinder.
2. Disconnect center link by lifting release (J)
and lift hook (K off header.
NOTE
If optional center link self-alignment kit is
installed, lift release (J) and then operate
the link lift cylinder from the cab to
disengage the center link from the header.
k. Slowly back tractor away from header.
NOTE
If hay conditioner is installed, watch
clearances on both sides.
l. Reinstall pin (A) into header leg and secure with
hairpin.
A
H
G
F
J
K

Table of Contents

Related product manuals