EasyManuals Logo
Home>Manitowoc>Construction Equipment>GROVE GMK 5095

Manitowoc GROVE GMK 5095 User Manual

Manitowoc GROVE GMK 5095
286 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #110 background imageLoading...
Page #110 background image
Swing-away lattice
3.4 Description of the rigging work
3 - 40 3 112 441 en Lattice extension operating instructions
GMK 4100/4100-L/5095
11.01.2008
(A) – Pull the pin (4) out of the bore (3) and
insert it in the holder (5).
Secure the pin (4) with the retaining pin.
You can now retract the slewing axis (1) so that
it no longer protrudes out of the holder (2).
(B) – Pull the lever (7) upwards against the
spring force into position (B).
Set down the lever (7) on the rest (6).
The slewing axis (1) is now retracted and
you can swing the lattice extension in front
of the main boom head.

Table of Contents

Other manuals for Manitowoc GROVE GMK 5095

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Manitowoc GROVE GMK 5095 and is the answer not in the manual?

Manitowoc GROVE GMK 5095 Specifications

General IconGeneral
BrandManitowoc
ModelGROVE GMK 5095
CategoryConstruction Equipment
LanguageEnglish

Related product manuals